May 28, 2025 3 Key Tips to Speed Up Fiber Builds
Fiber builds are booming and the reason is simple. We’ve become an online nation and the appetite for high-speed internet seems insatiable. More people are video streaming, online learning and gaming and shopping, remote working, and accessing social media than ever before.
The numbers confirm it. The share of adults who reported using the internet rose from 86% in 2015 to 95% in 2023 (Pew Research Center). U.S. Census Bureau data shows that in 2021, annual revenue for online services jumped by $66.1 billion. And it just keeps going up.
Those broadband providers who can quickly build out the infrastructure to meet the demand can reap major financial rewards. For that reason, speed is of the essence. Based on our experience in outside plant construction, we’d like to offer 3 key tips on how broadband providers can speed construction.
- Reality-Check Engineering Designs
- Build Permitting into Lead Times and Start Early
- Maintain Continuous Communication Throughout the Build

Reality-Check Engineering Designs
It has always been the case that fiber build designs are developed by Engineers who do not always have the boots-on-the-ground experience to account for construction realities. That issue has been exacerbated as more companies look to save costs by outsourcing engineering. to India and other areas far from where construction is to take place. Therefore, issues can arise.
For example, we met with a municipality who based their fiber build costs and timings on designs developed in Bangalore. The problem was those designs were never vetted against the actual mountainous location – and natural obstacles – where the build was to take place. We performed a walk-through and determined the actual build cost and timing was 6 times higher than estimated.
Accordingly, we recommend that you have your internal construction experts and/or construction vendor always perform a walk-out to verify that the design takes construction realities into account… and avoid unpleasant surprises and delays down the road.
Build Permitting into Lead Times and Start Early
Fiber build construction cannot begin until the proper permits are in place. However, the turnaround time to obtain these needed permits can vary greatly from place to place depending on local governmental staffing, processes and bureaucracy.
All too often, construction teams are assembled and ready to go, only to have wait weeks for permits to come through.
To avoid suffering this kind of unwanted work stoppage, start the permit process as early as possible, accounting for expected turnaround times.
Maintain Continuous Communication Throughout the Build
Regardless of how well you plan your fiber build, when work actually starts… stuff happens. Locates can be wrong. Mistakes can be made. Unexpected slowdowns can occur. So don’t wait for the due date to learn the due date will be missed.
Do continuously communicate with your construction vendor to assure the build is on track. We, for example, typically have daily check-in with our clients. That way, if problems occur – as they inevitably will – there is still time enough to correct them.
By following these simple tips, you can help assure that the construction process happens as quickly you’ve targeted. And you can draw the shortest line possible between dollar of capital invested and dollar of revenue realized. And to learn more on how ByverTek can help you do it, click here!